Tuesday, January 17, 2023
Complete Surf System
I have the PCB designs for the Complete Surf System done and ready to send off for manufacturing. This is the main controller that runs all the logic code and drives the display. The GPS, and circuitry for reading the level of the ballast bags with a pressure transducer, gyroscope and tach/fuel inputs are also on this board. This board will mount on top of the relay driver board.
Sunday, January 15, 2023
Complete Surf System
If you have been following this, I started a Perfect Speed project a while back and have not posted an update in quite a while. That project has turned into MUCH more. It will actually control the entire surf system on the boat, ballast bags, surf gates & tabs, wake plate and boat speed.
Finally, when you are done for the day, you can turn the system off and the wake plate as well as all the gates and tabs will fully retract. The ballast bags will also fully empty. The green/red progress bars tell you the direction things are moving. Orange tells you they are not currently in motion.
Fresh Air Exhaust
The down pipe is finished and tacked onto the main pipe. I still need to make the support structure, but I think I will build the new swim platform first. Because I have never welded exhaust pipe before, I'm going to have to have the final welding done elsewhere. Next up is the muffler delete.
Saturday, January 7, 2023
Fresh Air Exhaust
I started building a Fresh Air Exhaust for the boat late last year, but I've been really bad about posting stuff on this blog. I have the main pipe finished. So next is the make the down pipe. I'm going to start with 3-1/2" oval pipe and squish one end back to round and the other end to a tear drop shape.
Subscribe to:
Comments (Atom)







